Building project updates w/c 11 July

There are works planned on site for Saturday morning (9th July) - this will consist of medium to low noisy works. There are no works planned on site on Sunday 10th July.

w/c 11th July

  • Main Core, English Faculty, BLL & Criminology (GF/FF/SF) - drilling & fixing for hoarding erection

  • Main Core, English Faculty & Criminology (GF / FF / SF / TF) Heavy demolition works throughout

  • Main Core Toilets (GF) - drilling & fixing into concrete & metal for partitions

  • Criminology ( FF) - drilling and fixing for partitions

  • Main Core Toilets (GF) - drilling & fixing into concrete & metal for partitions

  • Main Core, English Faculty, BLL & Criminology (GF/FF/SF) - Mechanical & Electrical disconnections

  • BLL Lift (GF / FF / SF) - installation of lift

  • Main Core, English Faculty (GF/FF/SF) - drilling & fixing for partitions

  • DDA Entrance area (GF) drilling and fixing for electrical works

  • Main Core, English Faculty (GF/FF/SF/TF) Heavy breaking out of concrete

Toilet facilities are available on the GF next to the Cube, and on the First Floor adjacent to the English Graduate Common Room.

Bike racks at the back of the building (near the Manor Road entrance) under the building overhang have been reopened.

The readers' entrance to the Law Library has moved to a ground floor door, off the lane which runs between the St Cross Building and the Manor Road Building.

During the summer the main entrance to the building will be undergoing refurbishment, and the porters will be relocating from their current space to a desk in the foyer.