Building project updates w/c 16 May

No works are planned for the weekend of the 14th/15th May. 

w/c 16th May

  • FF BLL stripping and removing metal book shelves and racking
  • SF/FF/GF BLL general cleaning and moving materials
  • FF Main core erecting shelving and general fixing for furniture
  • Temporary ladies toilets have been installed outside of the building. Male toilets are available on the first floor, adjacent to the porters lodge.
  • The Missing Bean will be operating  from the area outside the English Graduate Common Room on the first floor. By kind permission of the English Faculty, students and staff are able to use the English Graduate Common Room on the first floor whilst the JCR and SCR are inaccessible. When the space is booked out for English faculty events it will be closed to other users and these bookings will be displayed on the door.