Building notices w/c 7th September 2015
w/c 7th September
- Heavy demolition work to GF areas (Toilets adjacent to Lecture Theatre 2 and mobile racking extension area in previous IECL space). The intention is to try and carry out all heavy work pre- 9am but some work will have to be done during the day.
A look ahead to the following week (w/c 14th September):
- Groundworks and drainage to commence.