Building notices w/c 7th September 2015

w/c 7th September

  • Heavy demolition work to GF areas (Toilets adjacent to Lecture Theatre 2 and mobile racking extension area in previous IECL space). The intention is to try and carry out all heavy work pre- 9am but some work will have to be done during the day.

A look ahead to the following week (w/c 14th September):

  •  Groundworks and drainage to commence.